LogoFountainof ScaleStart my migration
Website Insight Report

Here's where you're losing time.

We analyzed Kyte Dynamics's site. Here's what we'd fix first.

Kyte Dynamics
Insight Report for
Kyte Dynamics
Client URL
https://kyte.aero
Industry
Aerospace / Industrial Rotorcraft
Website Pages
5
Immediate Opportunity

Every change to your site goes through someone else first

Updates sitting in a queue. Designer availability. Briefs that take a week to turn around. Time you don't get back.

0days
Average wait time
per website change
(website builders + designer + engineer)
3d
From 3 days down to 10min
after migration
The Problem

Every time you want to change something, it becomes a project

Where manual website management slows you down.

Update homepage hero copy
Should take5 min
Actually takes2–5 days
WhyDesigner queue
Add a new landing page
Should take1 day
Actually takes1–2 weeks
WhyBrief → build → approve
Test a different CTA
Should take10 min
Actually takesBlocked
WhyNeed dev or platform expertise
Respond to market feedback
Should takeSame day
Actually takesNext sprint
WhyNo direct access

By the time it's live, the moment's passed. For a business that needs to move fast, that friction costs more than the subscription.

After Migration

What full control looks like

The site moves at your speed, not a designer's schedule.

AI-Powered

Make updates whenever inspiration strikes

Full control. Change things whenever you want.

How it works for Kyte Dynamics
You say
"Simplify the hero — 'large, industrial rotorcraft that interface with people and structures better' is too long. Lead with what makes it different from other UAVs"
✓ Hero updated to 'The UAV That Gets Closer — Safely'
You say
"Add a one-liner under each of the 3 How It Works steps — Payload Stabilization, Gust-Resistant Delivery, Higher Standoff Distances"
✓ Step outcomes added: what each capability means for an operator in the field
You say
"Change 'Contact Us' to 'Request a Demo Flight'"
✓ CTA changed from 'Contact Us' to 'Request a Demo Flight' in nav and hero
What's Included

Everything in the migration

Your migration. First week we're hands-on. Then it's yours.

Full Audit
We map every page, form, and integration before touching anything
Complete Rebuild
Same design, same URLs, cleaner code you actually own
Full Testing
Every URL, form, and integration verified before go-live
SEO-Safe Launch
301 redirects, DNS migration, Google Lighthouse verified
First Week Support
First week after launch is on us. Any issue, we're on it.
Yours Forever
After day 7, it's yours completely. No lock-in, no retainer required

Timeline: 1–2 weeks start to finish.

Website Migration · Your Code to Keep

Ready to own your website?

After submitting, we'll ask you a few quick questions about your site. We use your answers to prep before we start.

After submitting, we'll ask you 5 quick questions about your site. We use your answers to prep before we start.
Data based on site audit of https://kyte.aero · Report prepared by Fountain of Scale